Home     Sitemap     Contacts     BG
Metrostations


Put into operation on May 8th 2009 Location and architectural design The station is situated between the crossing of Andey Saharov blvd. with Jerusalem str. in Mladost 1 RD and the market place on both sides of the boulevard in the direction of A. Malinov blvd. It is under the ground, with side platforms, shallow laid. The platform is 105 m long above the section. The station is in blue with light yellow walls and floor. There are transverse arch-shaped components of suspended...




Put into operation on May 8th 2009 Location and architectural design The station is totally above ground, with platform length 105 m. It is situated on Andrey Saharov blvd., close to a bridge. It has one vestibule with entrance from the street under the bridge. The station is preliminary fixed and limited in functional scheme and dimensions by the already existing bridge and the necessity of link between the two parts of Musagenitsa quarter. The station is a compact cylinder like...




Put into operation on May 8th 2009 Location and architectural design After the railway overpass of the route, covered with polycarbonate panels, it crosses G. M. Dimitrov blvd. subterraneous, where the station is situated at the same level with the subway. The station is with two ground vestibules.as well as an underground connection with the subway of the crossroad. Because of its strategic location, passenger flows of more than 25 thousand people in peak hours are expected. It...



<< < 1 2 3 4 5 6 7 8 9 10 > >> 

"Metropolitan" EAD 2016 | All rights reserved
By: xdm